Overboost44
Well-known member
I titled this the way I did because I have not begun my project. I have not started a build thread...yet.
While I am awaiting drawings, I am thinking and planning ahead. I will be the GC on my long-awaited 32x26 attached garage project. I have done a ton of research and this site has been invaluable for information. Now I am concentrating on getting the radiant heat system laid out. Foundation and footers will be done by others. I will likely lay the rebar in all areas and plate tamp the stone. I will be installing the radiant tubing and tie it off to the rebar. The slab will be 5" 4000psi, and rebar will sit on 2.5" chairs. This will all sit on a 10 or 15mil vapor barrier and 2" R-10 insulation on bottom and sides.
The design options seem endless and I can always get a supplier to send me a loopCAD or do one myself. Again, just thinking ahead and looking for opinions. So, 832 sq. ft turns into about 775. I will need 3-300' rolls or a 1000' roll if I want to keep some long lengths for another project. Here is my drawing. Circuit 3 (at the top) could be layed out like the 1st and 2nd or vice-versa. You will see the lift location and the possible support pole location for the 14' wide second story. I will avoid each of these areas with the tubing and have plenty of pictures/video to be able to verify. I have estimated the lengths of each circuit at 251', 251' and 269'
Here is my rendering. I look forward to your thoughts.

While I am awaiting drawings, I am thinking and planning ahead. I will be the GC on my long-awaited 32x26 attached garage project. I have done a ton of research and this site has been invaluable for information. Now I am concentrating on getting the radiant heat system laid out. Foundation and footers will be done by others. I will likely lay the rebar in all areas and plate tamp the stone. I will be installing the radiant tubing and tie it off to the rebar. The slab will be 5" 4000psi, and rebar will sit on 2.5" chairs. This will all sit on a 10 or 15mil vapor barrier and 2" R-10 insulation on bottom and sides.
The design options seem endless and I can always get a supplier to send me a loopCAD or do one myself. Again, just thinking ahead and looking for opinions. So, 832 sq. ft turns into about 775. I will need 3-300' rolls or a 1000' roll if I want to keep some long lengths for another project. Here is my drawing. Circuit 3 (at the top) could be layed out like the 1st and 2nd or vice-versa. You will see the lift location and the possible support pole location for the 14' wide second story. I will avoid each of these areas with the tubing and have plenty of pictures/video to be able to verify. I have estimated the lengths of each circuit at 251', 251' and 269'
Here is my rendering. I look forward to your thoughts.

