I'm pouring a 40x60 frost protected monolithic slab, which includes 3 inches of EPS foam under the concrete to prevent the subgrade from freezing and heaving. My original plan was to first install the vapor barrier, then the foam, then staple to PEX directly to the foam board.
But after thinking about it some, I am worried than if there is fuel leak or solvent leak on the slab or right next to it, it could compromise my foundation by eating away the EPS insulation and cause the slab to crack and fail. So to mitigate this risk my new plan is to put a heavy duty 15 mil vapor barrier on top of the foam board, and tying the PEX right to the rebar. The only obvious draw back from this is accidently cutting it with the saw afterwards.
Obviously I'm not going to go out of the way and pour fuel all over my shop but as we all know accidents happen and I'd rather not have to worry about it.
Anyone one else think about this or am I overthinking it?
But after thinking about it some, I am worried than if there is fuel leak or solvent leak on the slab or right next to it, it could compromise my foundation by eating away the EPS insulation and cause the slab to crack and fail. So to mitigate this risk my new plan is to put a heavy duty 15 mil vapor barrier on top of the foam board, and tying the PEX right to the rebar. The only obvious draw back from this is accidently cutting it with the saw afterwards.
Obviously I'm not going to go out of the way and pour fuel all over my shop but as we all know accidents happen and I'd rather not have to worry about it.
Anyone one else think about this or am I overthinking it?