This is my journey of building my dream workshop. I started building in March of 2026. Planning started in 2024 to get all the permits and Fire Department approvals. The building is made of cold formed steel and is 36' x 50'. Sidewall height is 19' and ridge peak is 25'. There is a lean-to that is 12' x 50' on one side. The building was engineered using the ACT building system, sold through a local sales rep. The building components were fabricated at Quicken Steel in Georgia and shipped on a flatbed to Northern California. The process has been fairly frustrating with the lack of detail in the plans and some pieces damaged / bent in shipping. Lots of head scratching and figuring things out. Calls to the sales rep, building manufacturer, and ACT are often very circular. Definitely not geared towards a first-time builder. If I ever built another one, it would go much faster, now the process is more understood. Not that I would do this again, but I can imagine the time would be cut in half if the instructions were better and I knew what I was doing. "How hard could it be?" is my motto that gets me in trouble sometimes.
