Post #0076a - Construction work continues - More progress at accommodation module - Part LXXI

Fitting out the interior kicked off with preparing the concrete slab in the accommodation module for tiling but first up the tiles arrived on site.

Nothing exotic was chosen. A single grey 600 x 600 mm (2’ x 2’) floor tile is used throughout, a small grey and white square tile laid in a checkerboard pattern for the kitchen bench splashback, subway pattern splashback for the laundrette bench and stack pattern feature wall in the bathroom combined with textured white tiles.

All the tiles were selected from Beaumont Tiles. Looks like those shown are made in China and Vietnam.

Post #0076a - Photo No. 1.jpg

Post #0076a - Photo No. 2.jpg

Off to a good start. The centre of the room has been identified and tile laying has commenced from the centre and also from a saw cut in the slab.

Post #0076a - Photo No. 3.jpg

Post #0076a - Photo No. 4.jpg

When talking to the tiler he said the demanding, physical nature of the trade was catching up with him, even though he was only in his late 30s. He’s given up starting apprentices as they’ve all quit in the first week.

Post #0076a - Photo No. 5.jpg

Notice how the tiler has only laid two tiles away from the saw cut, so that a walkway is maintained to allow him to keep working towards the sliding glass door.

Post #0076a - Photo No. 6.jpg

Next up, the full tiles were laid towards the laundrette. From what I understand, to maintain efficiency, the approach is to lay as many full tiles as possible, leaving the tile cuts to another stage.

Post #0076a - Photo No. 7.jpg

Actually, this floor tile was a substitution due to the discontinuation of our first preference.

Post #0076a - Photo No. 8.jpg

To be continued.
 

Coolabah

Well-known member
Joined
Jun 6, 2010
Messages
1,397
Location
Usually at the Bodalla Pub, Australia
Just curious :unsure: why lay tile before the drywall isn't at least primed?
I've done a few builds in Australia over the years, and I would say that is indeed a good question and I guess building practices vary over the world. A friend of mine used to live in Hong Kong, and told me that the usual practice for a bathroom was to lay all the tiles in an empty room, then bash holes through all the tiles , install plumbing , then replace all the broken tiles ( I do not know if this was actually true, surprised me to be sure !!).
Usually I find the tilers splash stuff up the walls so I'm glad I haven't painted them yet !!
So, usually : floor tiles, paint walls , skirting boards install ( or skirting boards before painting, depends on when the painters are available or if I'm doing it myself)
 
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
Just curious :unsure: why lay tile before the drywall isn't at least primed?
@Mr onetwo @Coolabah is on the right track in terms of the trade order and bathroom walls can cop a bit of splash when the tiler lays the screed floor.

The main determining factor in this case is the painting was being done by spray painting which is becoming very common to achieve very high standard finishes. So, the process demands reducing the likelihood of damage to painted surfaces post painting. Hence all possible trades, where possible, are completed before painting.

Hence, the order here is: 1) door jambs, door headers, door/window trim before tiling where tiles are laid to meet these, 2) floor screed laid, floor tiling and some wall/skirting tiles, 3) staircase treads and risers, 4) door jambs, door headers, remaining door/window trim and skirting boards, 5) test fit and resize doors as needed, cut handle recesses etc. 6) cabinetry, 7) tile splash backs, 8) painting...
 
Last edited:
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
Post #0076b - Construction work continues - More progress at accommodation module continued - Part LXXI

The next few photos show the completed tiles in the living area (except for grouting). To the left-hand-side of the plastic, cardboard floor protection has been laid and it doesn’t look like it’s been tiled.

Post #0076b - Photo No. 1.jpg

Post #0076b - Photo No. 2.jpg

Post #0076b - Photo No. 3.jpg

I opted to install a floor drain in the laundrette, even though one is not mandatory. To me, it's just common sense to have one.

Post #0076b - Photo No. 4.jpg

Meanwhile, the specialists laying the reclaimed timber on the staircase were also on site. To do this you need a stockpile of pre-cut treads and risers.

Post #0076b - Photo No. 5.jpg

The pine stiles or side rails will simply be painted.

Post #0076b - Photo No. 6.jpg

All done, except for final sanding and application of an anti-slip coating.

Post #0076b - Photo No. 7.jpg

To be continued.
 
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
Post #0076c - Construction work continues - More progress at accommodation module continued - Part LXXI

With the tiles laid in the living area the tiler then progressed to laying a mortar screed in the bathroom.

This photo shows about half of the floor area done.

Post #0076c - Photo No. 1.jpg

Now completed, looking in from the main shed space.

Post #0076c - Photo No. 2.jpg

Post #0076c - Photo No. 3.jpg

Taped off to prevent entry.

Post #0076c - Photo No. 4.jpg

Toilet suite area.

Post #0076c - Photo No. 5.jpg

Entry area to bathroom from living area. Again, I opted to include a floor drain, even though it’s not a mandatory plumbing code requirement.

Post #0076c - Photo No. 6.jpg

Vanity basin area.

Post #0076c - Photo No. 7.jpg

Shower cubicle area.

Post #0076c - Photo No. 8.jpg

The plasterers also returned and enclosed the laundrette by filling in the hole to the staircase and adding a ceiling.

Again, I opted to include a floor drain, even though it’s not a mandatory plumbing code requirement.

Post #0076c - PhotoNo. 9.jpg
 

Coolabah

Well-known member
Joined
Jun 6, 2010
Messages
1,397
Location
Usually at the Bodalla Pub, Australia
@Mr onetwo @Coolabah is on the right track in terms of the trade order and bathroom walls can cop a bit of splash when the tiler lays the screed floor.

The main determining factor in this case is the painting was being done by spray painting which is becoming very common to achieve very high standard finishes. So, the process demands reducing the likelihood of damage to painted surfaces post painting. Hence all possible trades, where possible, are completed before painting.

Hence, the order here is: 1) door jambs, door headers, door/window trim before tiling where tiles are laid to meet these, 2) floor screed laid, floor tiling and some wall/skirting tiles, 3) staircase treads and risers, 4) door jambs, door headers, remaining door/window trim and skirting boards, 5) test fit and resize doors as needed, cut handle recesses etc. 6) cabinetry, 7) tile splash backs, 8) painting...
Indeed, and I guess order can change depending on Trades availability etc- bear in mind they'd rather attend once rather than twice, which I totally understand :)
In my recent build, (second storey addition and complete strip out and remodel, where I did all interior painting and cabinet work/ kitchen install etc ) order ended up being:
a) framing b) drywall or fibre cement panels 1) door jambs, door headers, door/window trim before tiling where tiles are laid to meet these, 2) floor screed laid, floor tiling and skirting tiles, 3) staircase treads and risers, c) paint walls , paint doors & woodwork, and woodwork (eg skirting boards) yet to be installed d) install cabinetry 4) remaining door/window trim and INSTALL skirting boards, 5) doors- cut handle recesses etc. 6) - 7) tile splash backs, 8) painting- touch up as needed
so - needs be as needs must I guess !

Enjoying your build progress !!!
 

Geoff289

Well-known member
Joined
Nov 10, 2013
Messages
1,260
Location
Melbourne, Australia
Not to be critical, but your choice of tile supplier suggests you like wasting money as much as Coolabah does. Maybe they were having a sale.

No doubt that's a bit harsh of me but on reading that bit of your update I recalled finding the floor tile we had picked, the exact same tile, at a non-descript tile place without a big fancy showroom display for exactly half the price of the place you got yours.

Anyway, your place is coming along very nicely and there seems to be an increasing risk of it being finished, for which I bet you can't wait.
 

Coolabah

Well-known member
Joined
Jun 6, 2010
Messages
1,397
Location
Usually at the Bodalla Pub, Australia
Not to be critical, but your choice of tile supplier suggests you like wasting money as much as Coolabah does. Maybe they were having a sale.

No doubt that's a bit harsh of me but on reading that bit of your update I recalled finding the floor tile we had picked, the exact same tile, at a non-descript tile place without a big fancy showroom display for exactly half the price of the place you got yours.

Anyway, your place is coming along very nicely and there seems to be an increasing risk of it being finished, for which I bet you can't wait.
I don't know Geoff, not to be critical (see what I did there ?) that certainly sounded exactly like most very critical comments that I've heard . Even if your assumption is correct, I'm not sure it needed to be said. Tile deals vary from state to state in Aus, and good on you for finding a cheap deal. Interestingly, in my recent build I purchased similar floor tiles through the cheapest supplier I could find- Beaumont tiles, who were also having a sale at the time. I picked up the tiles from their store to save delivery fee, and they were very helpful when I needed more tiles from the same batch in a hurry due to a tiler's apprentice snafu.
Edit: and Geoff, I appreciate a joke and being roasted, more so than most. But , hey , the occasional positive comment would distinguish your online behaviour towards me from joking amongst mates ( note: I have never met you ) to just plain bullying. Just MHO.
 
Last edited:
To avoid these ads, REGISTER NOW!

Geoff289

Well-known member
Joined
Nov 10, 2013
Messages
1,260
Location
Melbourne, Australia
Greg, two possibilities come to mind.

The first is that I've unintentionally actually offended either you or Kitdoctor. If so, I unreservedly apologise. The point was not to be critical of either of you, rather to be critical of the large, prominent tile supplier he used, and the margins they place on their products. Who do you think pays for those flashy showrooms and displays? Including you in the comment was, in my mind, just continuing the banter we've enjoyed on here for years. I note that I have always been positive in my comments about this impressive project, including in my last paragraph above.

The second is that you're actually winding me up now, in which case well done.
 

Coolabah

Well-known member
Joined
Jun 6, 2010
Messages
1,397
Location
Usually at the Bodalla Pub, Australia
Greg, two possibilities come to mind.

The first is that I've unintentionally actually offended either you or Kitdoctor. If so, I unreservedly apologise. The point was not to be critical of either of you, rather to be critical of the large, prominent tile supplier he used, and the margins they place on their products. Who do you think pays for those flashy showrooms and displays? Including you in the comment was, in my mind, just continuing the banter we've enjoyed on here for years. I note that I have always been positive in my comments about this impressive project, including in my last paragraph above.

The second is that you're actually winding me up now, in which case well done.
Yeh, winding you up of course but upon re-reading my post , I might have overdone it a bit :shock:
 
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
The first is that I've unintentionally actually offended either you or Kitdoctor. If so, I unreservedly apologise.
@Geoff289, I'm not offended at all. Even I know they are expensive but they were the only tile supplier my builder held an account with.

Even worse, staffed by a bunch of girls who are too busy gossiping to serve customers and expect you to make an appointment when you ask for some assistance :LOL:
 
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
A chapter just closed 😌 with the contract for the sale of our home in Darwin of 25 years going unconditional.

So, we are just waiting for settlement to occur 🍾 and it has a new owner.

I do hate buyers who haggle (amongst other traits, like not meeting deadlines) when they get a great deal buying the best property in the entire estate with many extras thrown in :mad: but there's nothing to be gained holding onto that for too long.
 
Last edited:
OP
K

kitdoctor

Well-known member
Joined
Oct 30, 2010
Messages
566
Location
Sunshine Coast, Australia
Post #0077a - Construction work continues - Water tank installation at shed - Part LXXII

Finally, the point had been reached where it was time to install the three 25 kL (6600 US gallons) water tanks. All of them were being placed against the north wall of the shed. Two of them would be connected in series and be used for “indoor water”. The third which receives some water from charged downpipes, would be used for “outdoor water”.

The colour of the tanks is Charcoal and was confirmed as an exact match to Dulux Monument. This was the colour chosen for the aluminium sliding glass window frames, exterior personnel doors etc.

The tanks had been strapped down for Tropical Cyclone Alfred in March using star pickets and ratchet straps. Each star picket was an absolute PIA to remove as they were inserted at least 400+ mm (16”) into the ground and the suction between them and the red clay soil was enormous.

If I recall correctly, I think I worked on removing the star pickets over the course of two days. I thought, if I didn’t do it, I’d just be paying the plumber to do it. Here are the tanks, with all the star pickets and straps removed.

Post #0077a - Photo No. 1.jpg

The site constraints required that the foundation preparation start with that required for the tank (TANK 1) closest to the retaining wall, on the west side of the shed. The set out required the bottom floor level of each tank to be at the same level as the others.

A couple of the tanks were relocated to make room for a spoil pile.

Post #0077a - Photo No. 2.jpg

Then, the site for the TANK 1 was levelled. Some of this material will eventually be returned and placed around each tank to reinstate the fall away from the building slab.

Post #0077a - Photo No. 3.jpg

The excavator brought in buckets of crusher dust from the stockpile which the plumber spread and levelled.

Post #0077a - Photo No. 4.jpg

Post #0077a - Photo No. 5.jpg

Here’s the completed crusher dust pad.

Post #0077a - Photo No. 6.jpg

A similar crusher dust pad was laid for TANK 2. The middle tank’s (TANK 2) position was easily set relative to the concrete pump plinth, so it was placed into position first.

Post #0077a - Photo No. 7.jpg

Post #0077a - Photo No. 8.jpg

It was then a case positioning the other tank (TANK 1) relative to the middle tank.

Here are the guys getting ready for the lift.

Post #0077a - Photo No. 9.jpg

When I returned, they had it safely in place.

Post #0077a - Photo No. 10.jpg

To be continued below.
 