Well-known member
Well when the lady at the permit office says "I'm sorry, but Randy is going to be your inspector, good luck". You know that's not good.
So after making sure I had everything in my shop buttoned up like a pro, I called in the inspection.
Fail.
First reason: #2 aluminum feeder line not enough for amperage allowed. It's a 100amp subpanel, and he cleared it on rough in. That one ticked me off.
Second reason: Needs an intersystem bonding means...........a what???
I had to do some research to figure out that one. Apparently there is a new code in my area that if I'm running coax an internet I need to have an intersystem grounding bar. Basically if I ever want to put dish, or I need to ground the cable, I have it already. But it doesn't even have to be in the ground, just line run for one.
Third reason: Needs a main breaker at the panel in the shop for a full shut down. That was easy.
Fourth reason: Cover plates on all boxes. Well I thought I had that. Every power box had a plate or plug and plate on it. I left my boxes for speaker wire, and Cat6 cables open since I'm going to try and paint after it passes inspection. Nope, all must be covered. Geez.
So I got a few surprises on this one, and an apparently very picky inspector. The thing that really bugs me is I now have to drop my subpanel to a 90-amp box because he changed his mind I guess on the feeder line.
Just letting yall know what I ran into to maybe garner something from it.
So after making sure I had everything in my shop buttoned up like a pro, I called in the inspection.
Fail.
First reason: #2 aluminum feeder line not enough for amperage allowed. It's a 100amp subpanel, and he cleared it on rough in. That one ticked me off.
Second reason: Needs an intersystem bonding means...........a what???
I had to do some research to figure out that one. Apparently there is a new code in my area that if I'm running coax an internet I need to have an intersystem grounding bar. Basically if I ever want to put dish, or I need to ground the cable, I have it already. But it doesn't even have to be in the ground, just line run for one.
Third reason: Needs a main breaker at the panel in the shop for a full shut down. That was easy.
Fourth reason: Cover plates on all boxes. Well I thought I had that. Every power box had a plate or plug and plate on it. I left my boxes for speaker wire, and Cat6 cables open since I'm going to try and paint after it passes inspection. Nope, all must be covered. Geez.
So I got a few surprises on this one, and an apparently very picky inspector. The thing that really bugs me is I now have to drop my subpanel to a 90-amp box because he changed his mind I guess on the feeder line.
Just letting yall know what I ran into to maybe garner something from it.





YES INDEED!!! After I had completed my electrical project I double triple checked everything EXCEPT it was my son who found & then put the little stickers on...