Another question I have as I am coming closer to pulling the trigger on one is,what I have basically learned is they say you have to have minimun of 4'' 3000 psi.Because of my radiant floor heat in the concrete,I chose to go 6'' for the whole floor(retain the heat longer from the larger mass of concrete),and knowing that I would def be doing a 2 post lift,the area where the bases would be I dug it extra deep,so it's in the neighborhhod of 8,9'' or so,maybe even more.And I got measurements from a lift company who is since out of business to divert tubing away from that area.
My question is,are the 5'' x 3/4'' quick bolts standard for these types of lifts??And as the bolt when hit in is really not going deeper than 4'' or so,so how far do you drill?Keep going so you know for sure they won't bottom out?If your floor is only 4'',you would just about be going thru it.
My question is,are the 5'' x 3/4'' quick bolts standard for these types of lifts??And as the bolt when hit in is really not going deeper than 4'' or so,so how far do you drill?Keep going so you know for sure they won't bottom out?If your floor is only 4'',you would just about be going thru it.