John in OH
Well-known member
I'm planning to run a 150 amp underground feed from a remote meter to my new detached garage and need advice on how to install the 2" PVC conduit through the building's footer and slab. I'll hire an electrician later to do the electrical work, but I was hoping to get a PVC conduit embed in place prior to pouring any concrete.
Structure will have a 2' wide footer 1' thick. Centered on top of the footer will be 5 courses of 8" block. 2x8 sill plate on block with 2x6 stud framing. Nothing is built yet.
My original thought was to place the horizontal PVC and long radius sweep in the bottom of the footer excavation and bring the vertical portion up just on the inside of the 8" block. But this leaves the conduit inside the building wall and I guess I'll have to use an LB elbow to take the cable back inside the stud wall and then up again into the breaker box. This doesn't sound like a very "clean" installation, but there is no way the 2" PVC can be fitted up through the inside of 5 courses of block ... at least without the block in place.
View attachment Embed.pdf
Any better ideas???
Structure will have a 2' wide footer 1' thick. Centered on top of the footer will be 5 courses of 8" block. 2x8 sill plate on block with 2x6 stud framing. Nothing is built yet.
My original thought was to place the horizontal PVC and long radius sweep in the bottom of the footer excavation and bring the vertical portion up just on the inside of the 8" block. But this leaves the conduit inside the building wall and I guess I'll have to use an LB elbow to take the cable back inside the stud wall and then up again into the breaker box. This doesn't sound like a very "clean" installation, but there is no way the 2" PVC can be fitted up through the inside of 5 courses of block ... at least without the block in place.
View attachment Embed.pdf
Any better ideas???