theoldwizard1
Well-known member
Okay, I know the "pros" wont like this, but this product saved my **** !
We were doing some landscaping at my son's house (establishing a grade that went AWAY from BOTH the house and garage) when we uncovered the 240V line going to the garage (10/3 UF) ... with a rototiller. We put a few nick in the outer sheathing that I just taped up, but I really want to rebury it about 3 feet down. Of course there was no slack.
So I bought 8' of 10/3 UF and 2 Tyco Raychem Underground Splice Kits at HD. Extra heavy duty heat shrink. Designed for direct burial so it must be waterproof.
We were doing some landscaping at my son's house (establishing a grade that went AWAY from BOTH the house and garage) when we uncovered the 240V line going to the garage (10/3 UF) ... with a rototiller. We put a few nick in the outer sheathing that I just taped up, but I really want to rebury it about 3 feet down. Of course there was no slack.
So I bought 8' of 10/3 UF and 2 Tyco Raychem Underground Splice Kits at HD. Extra heavy duty heat shrink. Designed for direct burial so it must be waterproof.