New guy around here, been lurking for a few months and have gotten a lot good ideas from this site. A little about me, I was a collision repair tech at a GM dealership for a little over 8yrs when I grew tired of dealing with insurance company estimates, parts issues, and just the lack of job benefits, so I made a drastic change and went to work in a factory as a production painter, painting big GREEN Ag Equipment. Been doing it for all most 8yrs now. I now primarily do automotive restoration projects in my free time out of my 24x24 garage. It gets the job done, but continually having to jockey projects around to get them inside and not having a dedicated paint space finally made me bite the bullet and build a new shop.
I settled on a 30x45 Morton Pole Building. It will have a 12x24 paint room, 2 stalls to work out of and a 12x15 workshop area for my tool boxes and motorcycle lift table.
Heres what its going to look like
And the floor plan
After the dirt work was completed in August
The Building material was finally delivered Sept 28th (only 4weeks late)
The way Morton uses the Semi as a fork lift to unload the trailers is pretty cool. Was very impressed by the driver, he would back up using only his mirrors grab a load and take off.
End of the first day, lower posts set
By the end of the second day its about 90% framed and really starting to take shape.
As the building progresses I'll post more pics. They are working on as I type this thread.
I settled on a 30x45 Morton Pole Building. It will have a 12x24 paint room, 2 stalls to work out of and a 12x15 workshop area for my tool boxes and motorcycle lift table.
Heres what its going to look like
And the floor plan
After the dirt work was completed in August
The Building material was finally delivered Sept 28th (only 4weeks late)
The way Morton uses the Semi as a fork lift to unload the trailers is pretty cool. Was very impressed by the driver, he would back up using only his mirrors grab a load and take off.
End of the first day, lower posts set
By the end of the second day its about 90% framed and really starting to take shape.
As the building progresses I'll post more pics. They are working on as I type this thread.