as for the concrete i paid $6,000.00 thats footings, walls, garage floor minus a 20x20 pad from olg garage and the walls on the north and east sides. and also the drive way in front of the garage where it ties into the old drive way. i think it was 4,000 mix poured at 4" thick. no rebar or mesh except to tie the floor to the walls.
the winch and attic pictures will take awhile to get since i have to pull the assecc ladder down and then climb up and i just had shoulder surgery on the 17th of this month. but i will post them when i can..and as soon as i can afford more insulation i will finish the walls and about 1/4 of the celing then sheetrock the last of the walls. medical expenses and starting a new mlm business has taken all the extra cash.
if any of you are interested in better health naturally chech out my web site at.
www.myhavvn.com/grichey
and thanks for your interest in my garage.. HAPPY HOLLIDAYS