Hopefully this is the correct section.
My slab has been poured inside my pole barn. Its about a week old. It measures 24'x28' with the two garage doors on the long side.
I planned on cutting a control joint between the garage doors which would make two 14x24 panels.
My contractor said I should do one the other way as well to make 4 14x12' panels.
Sounds good to me but it would run directly under where my 2 post lift will bolt down to. That's a little disconcerting to me.
This is a 6" slab with lots of rebar and 4'x4'x12" pads where the lift goes.
What do you guys think?
My slab has been poured inside my pole barn. Its about a week old. It measures 24'x28' with the two garage doors on the long side.
I planned on cutting a control joint between the garage doors which would make two 14x24 panels.
My contractor said I should do one the other way as well to make 4 14x12' panels.
Sounds good to me but it would run directly under where my 2 post lift will bolt down to. That's a little disconcerting to me.
This is a 6" slab with lots of rebar and 4'x4'x12" pads where the lift goes.
What do you guys think?