New member here, looking for some opinions on pouring a concrete slab.
I'm in Manitoba, Canada for starters.
I'm going to be building a 26'x34'x10' shop. I'm planning on running PEX for in-floor heat.
Questions:
1) Insulating - I've read that you only need insulation around the perimeter of the slab (vertically) and out flat about 16" around the outside (horizonatally).
I've also been told to put insulation under the whole slab with a vapour barrier on top. Which is preffered?
2) Forming - I want to have a 6" curb above the slab to stand my walls on. How to you go about forming this? Would you pour the curb after or at the same time?
3) Rebar or Wire mesh? I plan on having fibre mesh put in the concrete.
I'll leave it at that for now, I'm sure I'll come up with more later.
TIA
I'm in Manitoba, Canada for starters.
I'm going to be building a 26'x34'x10' shop. I'm planning on running PEX for in-floor heat.
Questions:
1) Insulating - I've read that you only need insulation around the perimeter of the slab (vertically) and out flat about 16" around the outside (horizonatally).
I've also been told to put insulation under the whole slab with a vapour barrier on top. Which is preffered?
2) Forming - I want to have a 6" curb above the slab to stand my walls on. How to you go about forming this? Would you pour the curb after or at the same time?
3) Rebar or Wire mesh? I plan on having fibre mesh put in the concrete.
I'll leave it at that for now, I'm sure I'll come up with more later.
TIA