I am one week into my new shop/garage project, and we started setting forms today. I ordered the in slab materials for a radiant heat system from a company I found through this site. It's here, and we will be ready to start laying tubing later this week.
Here's the rub... Everything I have heard or read makes me wonder if the tubing runs these guys have spec'd out are too long. He sent me 3 500' rolls of 1/2" PEX, and is planning a 3 loop (1 zone) system for my 1440sf slab (monolithic) on grade building. I asked about the long loops, and he went to some length to assure me that they've got it all figured out, and with the right pump a 500' loop of 1/2" is just ducky. I had a plumber over today to look at the rest of my project, and found out he has a good bit of radiant install experience, and he just about had puppies when I told him the supplier was calling for 500' runs.
Ok, let me have it!
I am one week into my new shop/garage project, and we started setting forms today. I ordered the in slab materials for a radiant heat system from a company I found through this site. It's here, and we will be ready to start laying tubing later this week.
Here's the rub... Everything I have heard or read makes me wonder if the tubing runs these guys have spec'd out are too long. He sent me 3 500' rolls of 1/2" PEX, and is planning a 3 loop (1 zone) system for my 1440sf slab (monolithic) on grade building. I asked about the long loops, and he went to some length to assure me that they've got it all figured out, and with the right pump a 500' loop of 1/2" is just ducky. I had a plumber over today to look at the rest of my project, and found out he has a good bit of radiant install experience, and he just about had puppies when I told him the supplier was calling for 500' runs.
Ok, let me have it!