Passed my first inspection.

Jefe

Well-known member
Joined
Oct 11, 2011
Messages
59
Location
OH-IO
But it was kind of a waste of time...
I was under the impression I could get away with only a final inspection for everything at once if I wanted, but could do a rough electrical since I paid for it.

My electrical was done, but I "undid" some of it for my optional rough in today. I figured he'd want to see things like wire nuts, length of wires, box fill, etc. Nope, he just glanced around for 5 minutes. Turns out, if I had just left it alone, he would have checked that everything worked and signed off on it as "final." However, I would still have needed my final structural. This is where I was confused, the office led me to believe the structural and electrical final would be done at once. Now I still need two more: final electrical and final structural.

In other news, to fuel the debate on 90a vs 100a on 2ga Al wire, I was told over the phone by the city that the 2ga was good for 90, as many here agree. However, I brought it up with the inspector, and he used the argument that "in residential you can go to 100a on 2ga." Just more proof that despite what should be allowed, individual inspectors do "interpret" codes differently. YMMV

Since I'm lazy, I still haven't posted my build thread. Hopefully that will happen soon.
 
To avoid these ads, REGISTER NOW!

wyliesdiesels

Well-known member
Joined
Aug 14, 2012
Messages
20,032
Location
Modesto, CA
But it was kind of a waste of time...
I was under the impression I could get away with only a final inspection for everything at once if I wanted, but could do a rough electrical since I paid for it.

My electrical was done, but I "undid" some of it for my optional rough in today. I figured he'd want to see things like wire nuts, length of wires, box fill, etc. Nope, he just glanced around for 5 minutes. Turns out, if I had just left it alone, he would have checked that everything worked and signed off on it as "final." However, I would still have needed my final structural. This is where I was confused, the office led me to believe the structural and electrical final would be done at once. Now I still need two more: final electrical and final structural.

In other news, to fuel the debate on 90a vs 100a on 2ga Al wire, I was told over the phone by the city that the 2ga was good for 90, as many here agree. However, I brought it up with the inspector, and he used the argument that "in residential you can go to 100a on 2ga." Just more proof that despite what should be allowed, individual inspectors do "interpret" codes differently. YMMV

Since I'm lazy, I still haven't posted my build thread. Hopefully that will happen soon.


Many inspectors nowadays just do a quick walk through and sign it off. You'd be amazed @ the stuff inspectors don't catch!

In regards to the 2ga al- it's rated for 100a if its CARRYING THE WHOLE LOAD of the dwelling/residential unit! If its a branch circuit, then 90a! So he is correct since it wasn't specified as to what application the wire is being used for!
 
To avoid these ads, REGISTER NOW!
OP
J

Jefe

Well-known member
Joined
Oct 11, 2011
Messages
59
Location
OH-IO
Many inspectors nowadays just do a quick walk through and sign it off. You'd be amazed @ the stuff inspectors don't catch!

In regards to the 2ga al- it's rated for 100a if its CARRYING THE WHOLE LOAD of the dwelling/residential unit! If its a branch circuit, then 90a! So he is correct since it wasn't specified as to what application the wire is being used for!

That's the funny part, he did know the application since he was standing in my basement talking about the feeder to the detached garage he was inspecting.

By the way, I had my final sign off inspection not long ago. I said "so I'm all good?" His response was "oh yeah man you're good. That's one heck of a garage you got now."

Will be sharing more in the gallery soon.
 

wyliesdiesels

Well-known member
Joined
Aug 14, 2012
Messages
20,032
Location
Modesto, CA
Well then I guess he wasn't paying attention! #2al is 90a for garage, outbuilding, branch circuit, etc. and 100a for entire house load!
 