Hello all,
I'm starting the new 26x24 garage project and I'm stuck on how to get power from the garage to the house. The plan was to put a mast and a meter on the garage, take power from the alley pole, and split the power to both the garage panel and the house panel just after the meter. I have a 100 amp house panel and would use a 60 amp garage panel. I was going to split the power in some kind of junction box and then run it down the outside of the garage wall and underground to the house. I can't seem to find anybody who knows how to do this although I haven't spoken with a residential electrician as I plan on doing most of the work myself. I even walked the back alleys and looked at dozens of garages that have power directly to the garage and nobody has done this the way I planned. Unfortunately I can't look in the garages to figure out how they ran the power in. I'm thinking I'm barking up the wrong tree. Perhaps I am required to run the power through the garage panel first??? Any ideas on how this is typically done? Until then I'll continue to read through the code book to see why my plan won't work.
I'm starting the new 26x24 garage project and I'm stuck on how to get power from the garage to the house. The plan was to put a mast and a meter on the garage, take power from the alley pole, and split the power to both the garage panel and the house panel just after the meter. I have a 100 amp house panel and would use a 60 amp garage panel. I was going to split the power in some kind of junction box and then run it down the outside of the garage wall and underground to the house. I can't seem to find anybody who knows how to do this although I haven't spoken with a residential electrician as I plan on doing most of the work myself. I even walked the back alleys and looked at dozens of garages that have power directly to the garage and nobody has done this the way I planned. Unfortunately I can't look in the garages to figure out how they ran the power in. I'm thinking I'm barking up the wrong tree. Perhaps I am required to run the power through the garage panel first??? Any ideas on how this is typically done? Until then I'll continue to read through the code book to see why my plan won't work.
