gotta56forme
Well-known member
I'm doing the preplanning for my Rustoleum Pro epoxy floor. I have cuts in my concrete that are less then 1/4 inch wide, that a Rustoleum tech support person said is a 'control' joint, not an expansion joint. I asked what I should fill them with prior to the epoxy floor and he said not to fill them. I understand why they are there, but I should be able to fill them with a flexible material... yes/no? I've read numerous threads here and saw the PL self levelling material associated with a Rustoleum floor. Should I feel confident using that in my 'control' joints?
Question #2: If I can fill the joints with something like the PL product, do I want to do it the last thing I do before applying the epoxy?
Thanks in advance for the info...
Scott/Gotta56forme
Question #2: If I can fill the joints with something like the PL product, do I want to do it the last thing I do before applying the epoxy?
Thanks in advance for the info...
Scott/Gotta56forme
Last edited:

