I have seven 12/2 w/ground wires in a 4" box. I can't get all the neutrals under one wire nut. Is it OK to tie them in two groups with a jumper between them? They are three runs back to the panel ( both phases), three switch legs, and a short extension to a nearby box with a GFI receptacle feeding an outside light. Each of the 3 switch legs feeds four 8 ft T8 fixtures, so there will be less than 15 amps flowing through the whole shebang.
What would the professionals do?
What would the professionals do?

I do a "PITA" count - how much hassle is it going to be later if I have to get in here and work on this. If the hassle factor is high, better re-think.