ybnormal70
Well-known member
My wife and I started Saturday morning with the cleaning of the new garage floor. First we swept it all good, then pressure washed it and finally mopped it clean and let it dry. After it dried we started spraying down the HD39. It went on very easy. Just kind of time consuming with the little sprayer we had.
We finished all 1800sqft of the inside part on Saturday. On Sunday we started on the 450sqft carport. Sunday morning I noticed that there were several areas that did not dry well where the sealer puddled up slightly. The directions said that it could just be left to air dry but I wouldn't recommend that. On the carport section we mopped it after it was mostly absorbed into the concrete to avoid this and it worked out great.
So far the floor seems to bead up water nicely. Other than that we haven't been able to do anything else with it because we haven't had anything to clean up from it yet.
If you have any questions, please ask.
L8r,
Kevin
We finished all 1800sqft of the inside part on Saturday. On Sunday we started on the 450sqft carport. Sunday morning I noticed that there were several areas that did not dry well where the sealer puddled up slightly. The directions said that it could just be left to air dry but I wouldn't recommend that. On the carport section we mopped it after it was mostly absorbed into the concrete to avoid this and it worked out great.
So far the floor seems to bead up water nicely. Other than that we haven't been able to do anything else with it because we haven't had anything to clean up from it yet.
If you have any questions, please ask.
L8r,
Kevin
Attachments
-
Concrete Floor Sealing (1).jpg65 KB · Views: 315 -
Concrete Floor Sealing After (16).jpg58.8 KB · Views: 295 -
Concrete Floor Sealing After (1).jpg72.7 KB · Views: 250 -
Concrete Floor Sealing (22).jpg84.5 KB · Views: 248 -
Concrete Floor Sealing (15).jpg72.1 KB · Views: 240 -
Concrete Floor Sealing (14).jpg77.8 KB · Views: 258 -
Concrete Floor Sealing (7).jpg61.2 KB · Views: 329