So this is just a preliminary planning idea I have been having as I have been getting quotes for a pole barn.
The house is currently fed with AL from the pole underground to my meter on the house and 200amp service. It's prob 2/0 or 4/0 whatever, doesn't matter yet.
My barn would be constructed behind the pole, as follows:
__________
| |
| BARN |
| |
| |
-----------y
(p)
-------------|
house |
----------x--|
p - pole
x - current meter
y - new meter/panel
So my idea would be to move the meter from the house to the barn and then feed the barn from the pole and the house from the barn.
If I wanted to fee the house with a generator from the barn I could do so.
What kind of options do I have?
I was thinking I could feed 200amps from the new barn panel to the house/breaker. Or would I need to feed the house from a new meter can with dual service disconnects?
Like I said, just planning and looking for some thoughts.
The house is currently fed with AL from the pole underground to my meter on the house and 200amp service. It's prob 2/0 or 4/0 whatever, doesn't matter yet.
My barn would be constructed behind the pole, as follows:
__________
| |
| BARN |
| |
| |
-----------y
(p)
-------------|
house |
----------x--|
p - pole
x - current meter
y - new meter/panel
So my idea would be to move the meter from the house to the barn and then feed the barn from the pole and the house from the barn.
If I wanted to fee the house with a generator from the barn I could do so.
What kind of options do I have?
I was thinking I could feed 200amps from the new barn panel to the house/breaker. Or would I need to feed the house from a new meter can with dual service disconnects?
Like I said, just planning and looking for some thoughts.