Last year I had a 45x56 pole shed built. The trusses are on 8ft centers and designed to hold a ceiling. I am getting ready to insulate the building before winter and am unsure on framing in the ceiling. The plan right now is to use 2x4's on 24in centers then insulate with R38 unfaced and staple 6mil plastic up to hold it in place and act as a vapor barrier. I won't be able to afford to put the steel up this year.
How should I attach the 2x4's to the trusses? Is end nailing one end then toenail or use joice hangers on the other end ok or do I need joice hangers on both sides?