I'm in the grading process of the construction of my 2450 square foot garage. I just received my first quoted and I'm rather shocked at the price. Looks like it is recommended to do 2 pours. 1 for the slab and 1 for the curbs that the walls will sit on. Below is the info on the quote.
* Footings & Pad footings
* Concrete curbs
* 5" slab on grad
* 4500 psi concrete
$38,500
So in getting any future bids on this project, would it be best for me to have them itemize the bid out? Like rebar, concrete, pumping and such so I see where all the costs are?
Any tips would be appreciated.
Thanks
Zoli