Hello--finally moving forward with construction on my building. They are breaking ground today.
It is a 55x50 building with 35x50 of it being enclosed and 20x55 is a covered storage area for my fifth wheel camper and bass boat. 3 12x12 rollup doors and 2 man doors. I have a Rotary lift that will eventually go in.
It is a steel prefab building purchased from Premier Buildings in Dacula Ga.
The clearing and grading guys will have to remove approximately 25 trees and a lot of underbrush to clear the 100x100 area that I need for the driveway and shop. My goal is to be able to drive the fifth wheel all the way around the building to avoid the need for backing it into the storage area.
It is a 55x50 building with 35x50 of it being enclosed and 20x55 is a covered storage area for my fifth wheel camper and bass boat. 3 12x12 rollup doors and 2 man doors. I have a Rotary lift that will eventually go in.
It is a steel prefab building purchased from Premier Buildings in Dacula Ga.
The clearing and grading guys will have to remove approximately 25 trees and a lot of underbrush to clear the 100x100 area that I need for the driveway and shop. My goal is to be able to drive the fifth wheel all the way around the building to avoid the need for backing it into the storage area.