2Big2Ride
Well-known member
Just want to confirm code from the pros. Have 1" PVC conduit (schedule 40) roughed in through concrete slab to feed in-floor boxes that will contain receptacles. Need to connect the conduit stub to the panel. Can I complete the conduit run with PVC or do I need to transition from PVC to EMT to the panel. This section will be concealed in wood framed wall covered with 1/2" drywall.
Most of the Internet searches come up with this type of answer: "...PVC conduit can be concealed within walls, floors, or ceilings; directly buried; or embedded in concrete in buildings of any height....and...PVC conduit Schedule 40 for use in exposed areas not subject to physical damage where the raceway is identified for the application."
Most of the Internet searches come up with this type of answer: "...PVC conduit can be concealed within walls, floors, or ceilings; directly buried; or embedded in concrete in buildings of any height....and...PVC conduit Schedule 40 for use in exposed areas not subject to physical damage where the raceway is identified for the application."