located in south carolina. dug down to get to untouched soil. used packer then put 4inch of 57 stone used packer again.. Its a monolithic slab footers are 12 by 18 around the whole outside 30x36 with a 4-5inch slab...Concrete guy cut relief cuts in it but i am wondering if they were not deep enough??...i back my pickup onto it today and then notice about 2 feet over from the relief cut there is a crack from the edge where the door is about 8 feet long
slab has been poured for about 2 months its fiber mess concrete..
thoughts?? i am just about to start framing and now im not sure what to do or what my options are? trying to get a picture uploaded