Okay, I have been lurking here for awhile and finally have the nads to post my question. Planing on building my shop soon and am still deciding where to put it, the place I prefer is the area I recently filled in with excavated soil and rock from a nearby road job. The area was filled over the coarse of about 4 months and I did attempt to make sure there was no voids and even soaked the area while it was filled. It has been 4 years I have planted grass and have had no sinking issues. My question is will this be a solid enough base for my 2 story 24x30 gambrel barn? I live in Massachusetts so I would go with a four foot footer with a four inch slab. To make matters worse I did take down some average size trees and left the stumps in the ground.
The stumps would be approx 8 feet below the current grade and each stump has a boulder five times the size of the stump. The fill was rather rocky but again I was cautious to make sure any voids were filled with sand. I would ensure to bring in some good base material and pack it well. Or should I just position my building someplace else. I really want to place it on this proposed site. Thank you for any feed back.
The stumps would be approx 8 feet below the current grade and each stump has a boulder five times the size of the stump. The fill was rather rocky but again I was cautious to make sure any voids were filled with sand. I would ensure to bring in some good base material and pack it well. Or should I just position my building someplace else. I really want to place it on this proposed site. Thank you for any feed back.