To avoid these ads, REGISTER NOW!

Epoxy garage floor before or after drywall?

jmarkwolf

Well-known member
Joined
Jan 15, 2013
Messages
1,836
Location
Southeast Michigan
1. Before drywall means that a lot of foot traffic and ground in drywall dust and mud etc., into my nice new concrete, that will need to be cleaned off of course.

2. After drywall means that drywall dust and mud will need to be cleaned off the epoxy afterwards. Anti-skid additive might complicate this process. Mud might not come off easy.

I can't believe that trying to tape down paper or tarp before hand in either case, will hold up due to dragging ladders and mud buckets around etc.

Any pearls of wisdom?
 
To avoid these ads, REGISTER NOW!

Junkman

Well-known member
Joined
Dec 18, 2006
Messages
6,752
Location
Northeastern CT
Depending on how smooth the concrete floor is will determine how much mud droppings, and dust will adhere to the concrete. My garage floors are power troweled to a extremely smooth finish, and after the drywall was installed and plastered, everything cleaned up fine with a scrapper and a broom. If it were a rough surface, it seems that they never come clean, no matter how much you sweep them.
 

LegacyIndustrial

ALLIANCE MEMBER
Joined
Jun 7, 2010
Messages
7,995
Location
deerfield, IL
Grind your floor post drywall and painting, coat the floor last.
Touch up your wall paint post floor coating.


Sent from my iPad using Tapatalk HD
 

600SL

Well-known member
Joined
Apr 26, 2012
Messages
1,801
Location
Connecticut
Grind your floor post drywall and painting, coat the floor last.
Touch up your wall paint post floor coating.


Sent from my iPad using Tapatalk HD

I wonder if the drywall guy would have the same opinion. That's probably the way I would do it with dry wall. Dry wall first then Epoxy

I'm having the same concerns with my interior corrugated steel walls. In this case I'm electing to Epoxy first and put the steel up later. The corrugated panels need to be 1/4" off the floor and getting in around and under the corrugations would be too difficult. Plus the steel doesn't make dust.
 

SunsetsAndFriends

Well-known member
Joined
Sep 10, 2012
Messages
753
I wonder if the drywall guy would have the same opinion. That's probably the way I would do it with dry wall. Dry wall first then Epoxy

I'm having the same concerns with my interior corrugated steel walls. In this case I'm electing to Epoxy first and put the steel up later. The corrugated panels need to be 1/4" off the floor and getting in around and under the corrugations would be too difficult. Plus the steel doesn't make dust.

I'm new to epoxy floors but I'm an above the DIY level construction guy, too. My two cents is this: you're on track with the corrugated last. Not only trying to paint under the corrugated tin will be a problem, but do you really want to be worrying about the tin while you're also "worrying" about the epoxy floor going on right, etc?
 
To avoid these ads, REGISTER NOW!

SunsetsAndFriends

Well-known member
Joined
Sep 10, 2012
Messages
753
Grind your floor post drywall and painting, coat the floor last.
Touch up your wall paint post floor coating.


Sent from my iPad using Tapatalk HD

jmarkwolf - I'm in line with Scotty from Legacy, do floor after drywall.

Regarding finish, unless you're set on your drywall guy doing your finish wall coat for you, I would recommend they apply the primer coat, which is common practice, then you do your epoxy floor. Then finish paint your walls after epoxy is on the floor.

The two advantages that I see are you will have your floor color on the floor which will finalize the wall color choice, since the floor is a whole lot of paint area, and the white primer walls will help you see the epoxy bumps on the wall so you can wipe them up. Also, latex drips should wipe right off the epoxy, but you'll probably use drop clothes anyway, so that might be moot.
 
Last edited:

Quijote

Well-known member
Joined
Feb 27, 2013
Messages
179
Location
Greater Boston
Piggyback question: Should I epoxy first and then install lift? I'm concerned about not having epoxy under the lift - and it would be a lot easier to epoxy with a lift in the way. But I am wondering if I may scratch the epoxy with the heavy lift.

Also, I am behind on the electrical, so I would have to do the walls after the epoxy.

Thoughts?
 

SunsetsAndFriends

Well-known member
Joined
Sep 10, 2012
Messages
753
I would install lift after epoxy if it were my garage. I like the idea of having a full and continuous epoxy membrane over the entire floor.

If you're hiring drywallers, you might want to ask if they can be more careful of floor or cover the floor with sheets of cardboard or something. You also might want to wait a couple of weeks to allow epoxy to cure. I've read that they cure in 7 days but being sure will not hurt.


Sent from my iPhone using Tapatalk
 
To avoid these ads, REGISTER NOW!
Top Bottom