Hey guys - I tried searching but came up empty in finding answers on this. Basically I'm wondering if I should try to run conduit to a box in my slab in the location I am eventually going to put a lift. The lift may be installed in 6 months or a couple years from now. I have no idea. But the slab is going to be poured in the next few days.
I guess that I'd try to run an air line as well as wiring down there to the best guess location as to where the post with those feeds would be. I'm probably going with the bendpak HD-9XW and have the drawings for that.
Does anyone go through the trouble of having this under the slab or does everyone just drop those lines from above? The tricky part would be having either conduit sticking up a foot or two in the middle of the slab until I installed the lift, or else terminating the conduit in a floor box that also would be out like an island in the slab or recessed. Recessing it brings the obvious issues of potential liquid incursion and keeping other dirt and debris out.
Advice would be greatly appreciated!
I guess that I'd try to run an air line as well as wiring down there to the best guess location as to where the post with those feeds would be. I'm probably going with the bendpak HD-9XW and have the drawings for that.
Does anyone go through the trouble of having this under the slab or does everyone just drop those lines from above? The tricky part would be having either conduit sticking up a foot or two in the middle of the slab until I installed the lift, or else terminating the conduit in a floor box that also would be out like an island in the slab or recessed. Recessing it brings the obvious issues of potential liquid incursion and keeping other dirt and debris out.
Advice would be greatly appreciated!