scoob8000
Well-known member
I'm no wheres near ready to start hanging sheetrock or osb yet, but I'm trying to plan out how I'm going to do it. Mainly to figure out how I'm running my electric, and how deep back to set my boxes.
It's typical pole barn construction. Posts 8ft apart with horizontal 2x4's on the outside every 2' for the exterior sheathing.
I originally had 3 ideas how to do this. Are there any other, cheaper or better ways?
A> Mimic what they did with the outside wall. Nail 2x4's to the posts horizontally every 2' to attach whatever wallboard to. This would result in a 8" thick wall though.
B> Same as A, but toe-nail the 2x4's between posts.
C> Frame up an actual wall between the posts. I think this would be the best, but most likely cost-prohibitive.
So far I'm leaning towards option A. If this is the case, would 1x3 furring strips suffice, or stick with actual studs?
It's typical pole barn construction. Posts 8ft apart with horizontal 2x4's on the outside every 2' for the exterior sheathing.
I originally had 3 ideas how to do this. Are there any other, cheaper or better ways?
A> Mimic what they did with the outside wall. Nail 2x4's to the posts horizontally every 2' to attach whatever wallboard to. This would result in a 8" thick wall though.
B> Same as A, but toe-nail the 2x4's between posts.
C> Frame up an actual wall between the posts. I think this would be the best, but most likely cost-prohibitive.
So far I'm leaning towards option A. If this is the case, would 1x3 furring strips suffice, or stick with actual studs?