Greetings,
When our house was built, I anticipated adding a barn/shop at a later time. I had them route 4awg copper wire from the panel to the inside corner of the house/garage nearest where the barn/shop would go some day. Currently the wire is not connected to anything inside the panel - it is just routed.
Based on voltage drop calculations for the 250ft distance to the barn/shop, I have decide to use 2/0 wire to go from the house to the barn/shop. It will be aluminum wire.
I will be mounting a large junction box to the inside of the house/garage to provide ample room for making the 4awg-to-2/0 splices.
Q1) What size box do you recommend. Other threads have talked about Code minimums (6", etc. ). But I am not size limited (lots of space on that wall.) - though I am watching my $. What box would you suggest as best for value and applicability?
Q2) What do you suggest using for the slices. Have heard about split bolts wrapped in a Mastic Pad, but have also heard about the ASR splicer/reducers, and using just electrical tape. Any advice?
Q3) One of the threads made reference to NEC 413.4(G) requiring smooth rounded insulating "fittings" where wires enter the box.... could you please elaborate with an example of such a fittiing (i.e. McMasterCarr, Graingers, HomeDepot, or other, part number)?
Q4) Several threads talked about having an "equipment" ground from the house panel to the garage/barn/shop. To make sure I understand, for 240V service, I need: a 2/0 red, a 2/0 black, a 2/0 white and a bare 1/0 wire (for the ground). Is that correct? I had read somewhere that the ground can be 1 size smaller than the other wires. Correct? Oh.. and it has to be URD wire, correct?
Q5) I am in Colorado (Larimer county). To the best of my knowledge this jurisdiction adheres to the NEC without substantial exceptions. Does anyone know how how deep in the ground I have to bury the wire?
Q6) Once the wire is inside the House/garage and inside the Barn/Shop, does it need to be routed in conduit on the way to the Junction Box , or the Barn/Shop Breaker Box? These are unfinished, uninsulated stick frame walls.
Thanks for all the help.
Mike
When our house was built, I anticipated adding a barn/shop at a later time. I had them route 4awg copper wire from the panel to the inside corner of the house/garage nearest where the barn/shop would go some day. Currently the wire is not connected to anything inside the panel - it is just routed.
Based on voltage drop calculations for the 250ft distance to the barn/shop, I have decide to use 2/0 wire to go from the house to the barn/shop. It will be aluminum wire.
I will be mounting a large junction box to the inside of the house/garage to provide ample room for making the 4awg-to-2/0 splices.
Q1) What size box do you recommend. Other threads have talked about Code minimums (6", etc. ). But I am not size limited (lots of space on that wall.) - though I am watching my $. What box would you suggest as best for value and applicability?
Q2) What do you suggest using for the slices. Have heard about split bolts wrapped in a Mastic Pad, but have also heard about the ASR splicer/reducers, and using just electrical tape. Any advice?
Q3) One of the threads made reference to NEC 413.4(G) requiring smooth rounded insulating "fittings" where wires enter the box.... could you please elaborate with an example of such a fittiing (i.e. McMasterCarr, Graingers, HomeDepot, or other, part number)?
Q4) Several threads talked about having an "equipment" ground from the house panel to the garage/barn/shop. To make sure I understand, for 240V service, I need: a 2/0 red, a 2/0 black, a 2/0 white and a bare 1/0 wire (for the ground). Is that correct? I had read somewhere that the ground can be 1 size smaller than the other wires. Correct? Oh.. and it has to be URD wire, correct?
Q5) I am in Colorado (Larimer county). To the best of my knowledge this jurisdiction adheres to the NEC without substantial exceptions. Does anyone know how how deep in the ground I have to bury the wire?
Q6) Once the wire is inside the House/garage and inside the Barn/Shop, does it need to be routed in conduit on the way to the Junction Box , or the Barn/Shop Breaker Box? These are unfinished, uninsulated stick frame walls.
Thanks for all the help.
Mike