Nothing personal Badger, but I did not think concrete was your forte. Most of the installs I have seen have the wire raised up on little "stools".If your slab is more than 4" you may want to tie PEX to wire. There is no benefit in raising PEX in a 4" slab or leaving the wire on the bottom.
Price difference between EPS and XPS is HUGE! Both are available in 25 psi. I used 25 psi EPS and saved big money. 6 mil VB under it.
Nothing personal Badger, but I did not think concrete was your forte. Most of the installs I have seen have the wire raised up on little "stools".
Can any one else confirm what Badger has said or post a link to a reference ?
Sounds logical !There is no question that reinforcing steel belongs in the middle of the slab for crack control
.
.
.
As for radiant heating; most use wire in order to have something to tie the PEX to
.
.
.
We staple it to 2" of XPS--about a dollar per sq.ft. in Minneapolis and put wire over it to control cracks ...
I assume this was 1 layer ?2" XPS has a perm of .07 making it an effective vapor "retarder", good enough for my office.