Hello. First post on the forum. Building a 40x80 with radiant. Had three courses of eight inch block laid. Layered about 12 inches of wet compacted sand. After the plumbing is done, two inches of polystyrene insulation will be laid on the plastic vapor barrier. There is a granite quarry nearby and the gravel crushing operation produces a granite powder residue. Seven inches of this granite powder will be laid and wet compacted. 3/4 Pex will be buried about two inches deep in the granite. Followed by four inches of concrete. This will give eleven inches of mass which will be heated by a larger, modified version of the water heater in the video. Don't know how many feet of Pex to use. Suggestions are welcome. Regards, Alan Waters If someone will tell me how to post photos and videos I'll post a few pictures of the progress.