I have a shop going up soon and I will be installing the service to it from my house panel. It will be a 100a panel.
The building will have a concrete floor with footings (the slab will have vapor barrier under it). I forgot to ask what size rebar will be used for the footing but if I understand correctly for the footing to be used as a UFER ground I need a minimum thickness of 1/2" correct?
Also, if the UFER ground will work I do not need additional grounding rods either, correct?
Then when tying into the rebar I understand I need 20' of continuous run of rebar or rebar connected via wire tie and I plan to stick the rebar above the concrete below the panel and make my connection there and that is acceptable as long as it does not count towards the 20'?
Final question, will I need to run #6 wire for the ground? I tried searching for all my answers and it seems most of the stuff mentioned early was consistent but the wire size seemed to range with #6 being the most consistent and I can't find where it will tell me the size I need.
The building will have a concrete floor with footings (the slab will have vapor barrier under it). I forgot to ask what size rebar will be used for the footing but if I understand correctly for the footing to be used as a UFER ground I need a minimum thickness of 1/2" correct?
Also, if the UFER ground will work I do not need additional grounding rods either, correct?
Then when tying into the rebar I understand I need 20' of continuous run of rebar or rebar connected via wire tie and I plan to stick the rebar above the concrete below the panel and make my connection there and that is acceptable as long as it does not count towards the 20'?
Final question, will I need to run #6 wire for the ground? I tried searching for all my answers and it seems most of the stuff mentioned early was consistent but the wire size seemed to range with #6 being the most consistent and I can't find where it will tell me the size I need.