bedn0009
Well-known member
Hello,
If I am having a slab poured that slopes 2" from front to back (in 28") what is done to prevent the bottom plate (and thus the entire wall) from being out of level?
How is this done on a single pour with integrated footing?
Thanks
If I am having a slab poured that slopes 2" from front to back (in 28") what is done to prevent the bottom plate (and thus the entire wall) from being out of level?
How is this done on a single pour with integrated footing?
Thanks

