I am looking to run a subpanel in the garage off the main. Was planning on running #2THHN wire for it. According to conduit fill charts, 1" will hold 3-#2 conductors. Is that including the ground wire, or only for current carrying conductors? And as a note, I was going to run a #6 for the ground wire