So I'm wanting to run a 120v 12/2 wire about 80ft from my shop to my back gate. I'm looking for input on what is required from a code standpoint.
I'm thinking 12/2 direct burial but what is required as far as the trench? What depth ect?
Where in the nec covers this sort of thing? I read through the feeder section but that didn't seem to apply.
Thanks,
I'm thinking 12/2 direct burial but what is required as far as the trench? What depth ect?
Where in the nec covers this sort of thing? I read through the feeder section but that didn't seem to apply.
Thanks,