I have had my footings and block wall foundation finished for almost a month. I have been patiently waiting for it to quit raining every other day so that I can pour my slab. I have covered it with tarps, but it is supposed to rain again tonight, and I found out that my concrete guy (my nephew) is in the hospital with cellulitis).
Should I just say F it and start framing? Im tired of looking at an unfinished project, and I cant continue with any of the other projects (yard, fence, etc) until this is done. Will there be issues with the finishing of the concrete if I have it framed? The slab will be 22'x36' so it will probably be poured and finished in sections as he goes along.
Sorry for the long post, just needed to vent. Thanks.
Hodag
Should I just say F it and start framing? Im tired of looking at an unfinished project, and I cant continue with any of the other projects (yard, fence, etc) until this is done. Will there be issues with the finishing of the concrete if I have it framed? The slab will be 22'x36' so it will probably be poured and finished in sections as he goes along.
Sorry for the long post, just needed to vent. Thanks.
Hodag
Attachments
Last edited: