^^^The concrete is a little over 10 years old, **** work done by the municipality, I'd say about 6-inches thick, handles foot as well as vehicular traffic
Then there is more concrete on the lot which is probably over 30-40 years old, almost appears as if broken into 3 large slabs, but technically was poured all at once (thus one slab) as far as others can recall
If I start sledge hammering the side walk, pedestrians are going to give me the look
I don't have a single sledge hammer (I do have 3lbs engineers Hammer, but only good for light work on the concrete pavement when used in conjunction with a chisel / pry bar),
I was going to buy a Stanley Fat Max from Amazon, but after I reviewing the responses here

I think the moral of the story is...there is no shortcut. How much do they (workers at the Home Depot Lot) take hourly?

Forget the sledge hammer, but was certainly worth asking
