I'm placing a 20 amp gfci outlet on the exterior of my house. The optimal location for the wire to exit the house is ten feet away from the outlet location. I was planning to use 1/2 inch sch 40pvc conduit. It will be under a deck approximately 8 inches above grade. Is this considered a wet location? Can I use 12/2 romex or do I need to pull thhn for that 10ft run?
I searched but found conflicting information on what is considered a wet location. Also found conflicting information on romex inside conduit.
Thanks GJ!