Hey all, I have been lurking and wanting to start my shop build for a while now and I have finally started. I am near Charlotte NC with clay/rock soil. I plan to build a 40'x60' with 14 foot tall ceiling for a lift and plan to do as much of the work myself as I can. At this point I have my pad roughed in and the footers dug.
After calling several concrete guys it seems I may need to bring my pad up so it does not fall below grade. I plan to do a monolithic pad and I would like some opinions on what to do at this point.
At the farthest point I am about 3 feet down. If I do need to bring the whole pad up how far with dirt before I get my stone? Thanks in advance

After calling several concrete guys it seems I may need to bring my pad up so it does not fall below grade. I plan to do a monolithic pad and I would like some opinions on what to do at this point.
At the farthest point I am about 3 feet down. If I do need to bring the whole pad up how far with dirt before I get my stone? Thanks in advance

Last edited: