MyPOCO doesn’t want to install a 5th service as it overloads the transformer and their feeder. They would but it’s high cost. I have a work around. My building has 4 retail spaces each with a 200a service. A few years back units 1-2 took out a wall and combined. Each service comes into a common utility room to a disconnect with 2-100A breakers then onto the sub in each unit. Highest load to the subs I have seen is 35A on one leg. I would like to bring the feeders to the subs into a box and pigtail the 4 leads down to 2 that go to a single main disconnect. Can I splice/ pigtail that size wire? If so what’s the best way? If I can do that it will save the tenant a meter fee and will give me a 200a service for little cost.