Good afternoon GJ! I have been trying to decide how I wanted to build my new shop for a couple months now. During that time searching for answers are what let me here so I joined. While I have had many questions answered I find myself searching the threads for countless hours trying to find answers and advice so to limit the searching I have decided to post my plans, not in great detail but enough to get feedback on things I may have planned wrong or get advice for other ways.
I have spoken with Town Hall and there are no permits or restrictions on this build when it happens. Also keep in mind I'm no expert, but not a novice either as I plan to build this myself.
-Pole building style 30' x 60' x 12' with 4x6 post 8' OC. Concrete footer & backfill.
-2x8 skirt / 2x4 girt 24" OC/ double 2x10 top rail
- Scissor trusses with 6/12 & 3/12 pitch, engineered for 4' OC & ceiling (FUTURE)
-2x4 purlins 24" OC
-Wrap the entire thing in single bubble type barrier (Plans to fully insulate walls and ceiling in the future)
-26 or 29 ga painted tuff rib all over with necessary trim. (29 gauge is 600 cheaper)
-Slab is 4" to 5" 3000psi concrete w/ fiber mix / #4 rebar 24" OC on 1.5" stands / moisture barrier
I will have a few roll up doors & man doors but this is my general idea. If you notice something off or have advice please let me know! I have a lot of work to do clearing land starting Saturday for a house & this shop but when I finalize my decisions and start the build I will post in the Gallery!
Thanks
I have spoken with Town Hall and there are no permits or restrictions on this build when it happens. Also keep in mind I'm no expert, but not a novice either as I plan to build this myself.
-Pole building style 30' x 60' x 12' with 4x6 post 8' OC. Concrete footer & backfill.
-2x8 skirt / 2x4 girt 24" OC/ double 2x10 top rail
- Scissor trusses with 6/12 & 3/12 pitch, engineered for 4' OC & ceiling (FUTURE)
-2x4 purlins 24" OC
-Wrap the entire thing in single bubble type barrier (Plans to fully insulate walls and ceiling in the future)
-26 or 29 ga painted tuff rib all over with necessary trim. (29 gauge is 600 cheaper)
-Slab is 4" to 5" 3000psi concrete w/ fiber mix / #4 rebar 24" OC on 1.5" stands / moisture barrier
I will have a few roll up doors & man doors but this is my general idea. If you notice something off or have advice please let me know! I have a lot of work to do clearing land starting Saturday for a house & this shop but when I finalize my decisions and start the build I will post in the Gallery!
Thanks