I bought a 2 post lift and got it mostly installed. The last hole on one of the columns I had to drill through rebar, but made it through. When I put the anchor in the concrete and I started to tighten it eventually just kept spinning. I am thinking it's unable to securely fasten due to the rebar.
How do I secure this last one? I was thinking about using some concrete filler- good product recommendations welcomed- and filling it about 1-2" so that it would cover the rebar. Once dried, then put the last bolt in. It would stick out a little more but I do not think it should be a big deal since the other 9 are good between the two posts. There are 5 per side.
I could try to get a longer bolt too, but unsure where to get these, they are different and unlike anything I have seen before. So finding one could be very difficult.
Thoughts?
How do I secure this last one? I was thinking about using some concrete filler- good product recommendations welcomed- and filling it about 1-2" so that it would cover the rebar. Once dried, then put the last bolt in. It would stick out a little more but I do not think it should be a big deal since the other 9 are good between the two posts. There are 5 per side.
I could try to get a longer bolt too, but unsure where to get these, they are different and unlike anything I have seen before. So finding one could be very difficult.
Thoughts?