First plan was to put up the building with no insulation and do foam in the future. Then I saw the price of foam and went 
So I figure if Im gonna do the fiberglass roll insulation on a metal building it has to be done when the building goes up, which is some time in the next 3 weeks.
Then I talk to my builder and he highly recommends foam. I get another qupte and it's 2x the price of fiberglass($9k vs $5K) for 1/3 of the insulation (r6 vs r19)
Ive read and read and my head is spinning over this decision. I know once the building is up I can do foam later when Im ready, but I cant get the fiberglass sandwiched between the walls and the beams/purlins after the building is built...

So I figure if Im gonna do the fiberglass roll insulation on a metal building it has to be done when the building goes up, which is some time in the next 3 weeks.
Then I talk to my builder and he highly recommends foam. I get another qupte and it's 2x the price of fiberglass($9k vs $5K) for 1/3 of the insulation (r6 vs r19)
Ive read and read and my head is spinning over this decision. I know once the building is up I can do foam later when Im ready, but I cant get the fiberglass sandwiched between the walls and the beams/purlins after the building is built...

