I’m installing a cable railing system for my staircase. I ripped off the sheetrock and now I’m removing all the vertical studs (metal and wood). I plan on covering “wall” A (open space b/w ceiling on 1st floor and floor of 2nd floor) with sheetrock. I can use an outside corner bead where the ceiling meets the sheetrock on wall A. And a J-bead where the floor meets the sheetrock on Wall A.
There is a small horizontal gap (anywhere from 1/2” to 7/8”) from where the floor ends and the sheetrock flushes up to it.
What are my options to cover that gap? My guess would be 1 1/16" quarter round moulding and install the sheetrock & J bead flush to the height of the quarter round.
Is there a better solution that looks more polished? My solution seems sort of rigged.
Thanks





Sent from my iPhone using Tapatalk
There is a small horizontal gap (anywhere from 1/2” to 7/8”) from where the floor ends and the sheetrock flushes up to it.
What are my options to cover that gap? My guess would be 1 1/16" quarter round moulding and install the sheetrock & J bead flush to the height of the quarter round.
Is there a better solution that looks more polished? My solution seems sort of rigged.
Thanks





Sent from my iPhone using Tapatalk








