Hi all, I was hoping for some advice.
If this doesn’t belong in the hvac section sorry, felt like the place to put it and I’m new here please forgive me.
Two weeks ago I finally poured the concrete in my work shop. I’m on a somewhat limited budget: I get to spend money as it arrives, but that’s not always steady so there can be a few months or more between project stages. I’m of the mindset I’d rather do it right and wait than rush it and regret...which is only sometimes conflicting with my desire to do most things myself.
(Link to my build A workshop that works...The Shade Tree Jeep shop.
https://r.tapatalk.com/shareLink?sh...om/forum/showthread.php?t=395402&share_type=t )
Anyway: I solicit advice on moving in!
Even though the building has been built for over a year I only now have a floor. But the walls are not insulated or framed, and it may be another year before I can get to that.
My tools are all in my two car attached garage that is insulated but not heated or cooled. It does benefit from being attached and rarely has drastic temperature swings.
My concern is moving all my tools into an un-insulated building for months or a year even in SE PA Might cause them to condensate and rust or have corrosion in the welder/plasma cutter etc. electronics.
Am I being too cautious? I’m eager to use my new space, even if it means having my workshop in the middle of a construction zone...
I plan to insulate and have radiant heating and insulation in the floor that will be eventually connected and running.
And the roof is insulated in 3/4” reflective foam so r-4ish directly under the tin.
Thoughts?
If this doesn’t belong in the hvac section sorry, felt like the place to put it and I’m new here please forgive me.
Two weeks ago I finally poured the concrete in my work shop. I’m on a somewhat limited budget: I get to spend money as it arrives, but that’s not always steady so there can be a few months or more between project stages. I’m of the mindset I’d rather do it right and wait than rush it and regret...which is only sometimes conflicting with my desire to do most things myself.
(Link to my build A workshop that works...The Shade Tree Jeep shop.
https://r.tapatalk.com/shareLink?sh...om/forum/showthread.php?t=395402&share_type=t )
Anyway: I solicit advice on moving in!
Even though the building has been built for over a year I only now have a floor. But the walls are not insulated or framed, and it may be another year before I can get to that.
My tools are all in my two car attached garage that is insulated but not heated or cooled. It does benefit from being attached and rarely has drastic temperature swings.
My concern is moving all my tools into an un-insulated building for months or a year even in SE PA Might cause them to condensate and rust or have corrosion in the welder/plasma cutter etc. electronics.
Am I being too cautious? I’m eager to use my new space, even if it means having my workshop in the middle of a construction zone...
I plan to insulate and have radiant heating and insulation in the floor that will be eventually connected and running.
And the roof is insulated in 3/4” reflective foam so r-4ish directly under the tin.
Thoughts?