Augus7us
Well-known member
I have to put a chimney in my shop for my forge and hopefully a pot belly stove.
I'm in the process of framing the walls of my existing building and would like to get this knocked out before I start insulating.
So from researching it looks like I have two options; go out the side and up or go straight up and out the roof.
Option A will be much easier for me than option B, mainly because I will not have to get on the roof. But I don't know which is best or if code would prohibit one or the other. I wasn't planning on having it inspected but I'd like it to be done right.
This will be located up against the wall and if possible I would like to have a "Y" up top so I can branch off from the forge and tie into a stove.
What say you guys?
-Clint
I'm in the process of framing the walls of my existing building and would like to get this knocked out before I start insulating.
So from researching it looks like I have two options; go out the side and up or go straight up and out the roof.
Option A will be much easier for me than option B, mainly because I will not have to get on the roof. But I don't know which is best or if code would prohibit one or the other. I wasn't planning on having it inspected but I'd like it to be done right.
This will be located up against the wall and if possible I would like to have a "Y" up top so I can branch off from the forge and tie into a stove.
What say you guys?
-Clint