Hi, I will soon be taking over a 30 x40 pole barn and the first order of business will be cementing it. I am planning on installing a inground scissor lift and was wondering which order of things would be best/ easiest before the pour?
I have read through the other threads about flush scissor lifts but they always have existing cement. Is there a way to have the lift holes and lines run before the pour? Or is this asking for trouble?
Any thoughts would be much appreciated
I have read through the other threads about flush scissor lifts but they always have existing cement. Is there a way to have the lift holes and lines run before the pour? Or is this asking for trouble?
Any thoughts would be much appreciated