Hello. I am looking to rehab my basement. I have contracted with a demolition contractor to come in and demo the existing, partially, finished basement. There is also 2000 sq ft worth of asbestos floor tiles that need to be removed. After this is completed I'd like to finish the concrete floor to make it a bit more aesthetically pleasing. This space will really only be used as a large play area for my children. I might setup a projector for movies.
I'm looking for some recommendations on how to move forward after the tiles are removed. I will be left with a bare, old, concrete floor. The floor is roughly 8" thick in some areas, I know this because we dug a sump pump not long ago, and it was a real pain in the ****. The home was built in the late 50's so the floor is OLD. It is in good shape though.
I'm looking for a cost effective, yet aesthetically pleasing option. What say you all? In total it is ~3,000 sq ft.
I'm looking for some recommendations on how to move forward after the tiles are removed. I will be left with a bare, old, concrete floor. The floor is roughly 8" thick in some areas, I know this because we dug a sump pump not long ago, and it was a real pain in the ****. The home was built in the late 50's so the floor is OLD. It is in good shape though.
I'm looking for a cost effective, yet aesthetically pleasing option. What say you all? In total it is ~3,000 sq ft.

