sansert
Well-known member
So I want to make sure contractor does this right. He is pouring a step footer and then block wall on top of that. He has vertical rebar in the footer but he says that it will extend into the blocks but not above any of them. The anchor bolts will be installed into the blocks for me to mount my framed wall to.Is this correct? Spacing of rebar? Supposed to pour footers saturday
