Alchymist
Well-known member
Was just wondering about this last night - no plans, as I haven't hit the lottery yet.
Scenario - large house, detached garage, and further detached large shop. 400 amp (320) service to the large shop - one 200 amp feed to shop 200 amp panel, second one to a transfer switch (in the shop) that feeds the house 200 amp panel, whole house genset on transfer switch. All pretty much straightforward.
OK, the kicker - when genset is running (Utility company power fail) - shop lights need to be on the genset. How would you all sparkies do it?
Kicking the can in 3, 2, 1......
Scenario - large house, detached garage, and further detached large shop. 400 amp (320) service to the large shop - one 200 amp feed to shop 200 amp panel, second one to a transfer switch (in the shop) that feeds the house 200 amp panel, whole house genset on transfer switch. All pretty much straightforward.
OK, the kicker - when genset is running (Utility company power fail) - shop lights need to be on the genset. How would you all sparkies do it?
Kicking the can in 3, 2, 1......